RUMBLESTRIP
Pulling my weight
Multiple PoE switches and running the necessary AC power just didn't seem to make sense. I'm not looking to add cost and failure points, I was just considering being lazy.Clearly you planned this out pretty well, but why are you running everything back to the basement instead of putting a POE switch per level?