I currently have BI running on a server with a i7 4790 cpu running at 3.6GHz and 16GB of ram. 11 cams.
I have available a dual processor server running 2 E5 2620's running at 2.00GHz. 24 cores total. 64GB of ram. I also have a couple of E5 2670's available I could drop in which would boost it up to 32 cores and 2.6GHz.
I plan to add a couple more cams so would it be worthwhile to transfer BI to the second server even tho the cpu speed is lower?
TIA
I have available a dual processor server running 2 E5 2620's running at 2.00GHz. 24 cores total. 64GB of ram. I also have a couple of E5 2670's available I could drop in which would boost it up to 32 cores and 2.6GHz.
I plan to add a couple more cams so would it be worthwhile to transfer BI to the second server even tho the cpu speed is lower?
TIA