Hello everyone,

I want to make the pre-installation for the security cameras in a new building. In our area, 3 methods are used for cable ducts:

-embedded in the concrete of the ceiling

techo.jpg

-under the floor tiles

suelo.jpg

-or later hidden in the plasterboard ceiling

pladur.jpg

For the wiring of the electricity lines we have chosen PVC pipes through the slab. I wonder if I should put more pvc pipes for the camera wiring, or do it in a different way: through the floor, or later with corrugated conduits hidden under the plasterboard ceiling.

I will appreciate all the tips, thank you very much
 

Kevin_Essiambre

Pulling my weight
Joined
Oct 29, 2018
Messages
99
Reaction score
122
Location
Ottawa, Ontario
I'd say thru the concrete is the best way right now. After the pour is done I'd vacuum a string in to ensure the conduit is still usable (sometimes Conduit gets crushed or pulled apart during pours). Option 2 and 3 are good for things that got forgotten or damaged and needs another or new lines run.
 